nanog mailing list archives

Re: Verizon DSL moving to CGN


From: Shishio Tsuchiya <shtsuchi () cisco com>
Date: Tue, 09 Apr 2013 00:30:19 +0900

Indeed MAP-E requires CPE replacement/upgrade cost.
But I would like to share JANOG Softwire WG Activity.
http://conference.apnic.net/__data/assets/pdf_file/0005/58856/apnic35-janog-softwire_1361559276.pdf

MAP-E already supported by 6 vendors,7 implementations.
It includes 2 open source(OpenWRT and ASAMAP) and 2 kernel(Linux 2.6.18 and NetBSD 4.0.1).

Regards,
Shishio

(2013/04/08 23:23), Jack Bates wrote:
On 4/8/2013 7:20 AM, Tore Anderson wrote:
BTW. It is AIUI quite possible with MAP to provision a "whole" IPv4
address or even a prefix to the subscriber, thus also taking away the
need for [srcport-restricted] NAPT44 in the CPE.

The problem is NAPT44 in the CPE isn't enough. We are reaching the point that 1 IPv4 Address per customer won't 
accommodate user bases.

The larger issue I think with MAP is CPE support requirements. There are ISP layouts that use bridging instead of CPE 
routers (which was a long term design to support IPv6 without CPE replacements years later). CGN will handle the IPv4 
issues in this setup just fine. Then there are those who have already deployed IPv6 capable CPEs with PPP or DHCP in 
a router configuration which does not have MAP support. Given the variety of CPE vendors that end up getting deployed 
over a longer period of time, it is easier and more cost effective to deploy CGN than try and replace all the CPEs.

Given US$35/CPE, cost for replacements (not including deployment costs) for 20k users is US$700k. CGN gear suddenly 
doesn't seem so costly.

The only way I see it justifiable is if you haven't had IPv6 deployment in mind yet and you are having to replace 
every CPE for IPv6 support anyways, you might go with a MAPS/IPv6 aware CPE which the customer pays for if they wish 
IPv6 connectivity(or during whatever slow trickle replacement methods you utilize). While waiting for the slow 
rollout, CGN would be an interim cost that would be acceptable. I'm not sure there is a reason for MAPS if you've 
already deployed CGN, though.

I am sure Verizon did a lot of cost analysis.

Jack

.




Current thread: