Re: FCC BDC engineer?


From: Josh Luthman <josh () imaginenetworksllc com>
Date: Tue, 5 Jul 2022 16:10:07 -0400

As of last week our discussions with the FCC have still not determined the
official ruling.  Again, my personal opinion is that it will not require a
PE stamp but rather depend on an individual to be a professional engineer.

On Tue, Jul 5, 2022 at 3:39 PM Andrew Latham <lathama () gmail com> wrote:

Josh, you are correct, I linked to the wrong document.

On Tue, Jul 5, 2022 at 1:36 PM Josh Luthman <josh () imaginenetworksllc com>
wrote:

Andrew,

Where does it say that it is or is not required?  This is a request for
clarification filed by the CCA.

On Tue, Jul 5, 2022 at 1:59 PM Andrew Latham <lathama () gmail com> wrote:

I read https://docs.fcc.gov/public/attachments/DA-22-543A1.pdf and a PE
is not required.

On Tue, Jul 5, 2022 at 9:47 AM KCI Dave Logan via NANOG <nanog () nanog org>
wrote:

Hi all.  We operate a small regional ISP in Colorado, but no size is
too small to ignore the FCC, as you all know.

We're really struggling to find the required engineer for the filing,
and we're small enough that we don't have an officer with engineering
credentials.

Any pointers in the CO/WY/NE/KS area would be great, on or off list.

I sure hope we're the only org with this problem still, and all the
rest of you are good to go.

Thanks,
dave

--

Dave Logan
Kentec Communications, Inc.
970-522-8107



--
- Andrew "lathama" Latham -



--
- Andrew "lathama" Latham -


Current thread: