Re: San Francisco Power Outage
From: "Brandon Galbraith" <brandon.galbraith () gmail com>
Date: Tue, 24 Jul 2007 21:57:09 -0500
On 7/24/07, Owen DeLong <owen () delong com> wrote:
On Jul 24, 2007, at 4:57 PM, Patrick Giagnocavo wrote: I have no idea what the root cause of today's outage is. I will be interested in hearing from any credible source as to any actual details, but, I'm betting that right now, any such credible source is a bit busy. Owen
It appears that 365 is using the Hytec Continuous Power System [ http://hitec.pageprocessor.nl/p3.php?RubriekID=2016], which is a motor, generator, flywheel, clutch, and Diesel engine all on the same shaft. They don't use batteries. If the flywheels spent their energy before the generators came online, they don't have the ability to start the generators up without utility power (unless they purchased the Dark Start option, which is simply extra batteries). -brandon
Current thread:
- RE: San Francisco Power Outage, (continued)
- RE: San Francisco Power Outage Raymond L. Corbin (Jul 24)
- Re: San Francisco Power Outage John Kinsella (Jul 24)
- Re: San Francisco Power Outage Tuc at T-B-O-H.NET (Jul 24)
- Re: San Francisco Power Outage Justin M. Streiner (Jul 24)
- Re: San Francisco Power Outage Michael Painter (Jul 25)
- Re: San Francisco Power Outage Jim Popovitch (Jul 24)
- RE: San Francisco Power Outage Alex Rubenstein (Jul 24)